|
Case
Study #4
Part
Name: Valve Stem
Material: alloy 655 silicon bronze (Everdur)
Challenge:
This complex piece required very precise work in a very tough material,
with surface finishes just this side of centerless grinding.
Solution:
Originally, this piece was produced in two steps, the first on a
2-axis lathe and the second on a 4-axis VMC. The total cycle time
was over 3 minutes. By running this part on the Tsugami CNC Swiss
screw machine, we reduced the cycle time to under 90 seconds, and
produced a part with better surface finishes and more accurately
located features. This relatively fast cycle time in such a tough
material was only possible because we used polycrystalline diamond
inserts for the turning.
|